Reference Projects

Completed Projects

TAI - Helicopter Manufacturing and Test Facilities

EPC Construction of the following buildings; Manufacturing Building, Engineering Building, Structural Test Building, Hangar, UPS Building, Cafeteria, Transmission Test Building, Ground Test Building.

  • Employer:Turkish Aerospace Industries, Inc.
  • Location:Ankara
  • Start Date:01.07.2015
  • End Date:16.07.2017

Kırka V. Borax Pentahydrate Plant

Within the scope of works, performance guaranteed, a 500,000 tons/year capacity Borax Pentahydrate main facility and the supplementary facilities for the production of steam, electricity, energy, water, ore crushing and preperation, etc has been built. The contract includes process design, basic and detailed engineering services, machinery and equipment, instruments control system, engineering, procurement, construction, installation, commissioning, performance testing, educational training.

  • Employer:General Directorate of Eti Mine Works
  • Location:Eskişehir-Kırka
  • Start Date:23.01.2012
  • End Date:27.11.2015

İzmir Metro Light Railway System-Phase II Construction

Construction of two stations and 5061 m line for commissioning. Scope of works include: Earth works, tunnel excavation (with NATM method),tunnel concrete Electro-mechanical works Signalization and safety system, Design, supply,installation, testing and commissioning of necessary equipment, Integration of all systems with 1st stage metro line which is under operation.

  • Employer:Izmir Metropolitian Municipality
  • Location:İzmir
  • Start Date:02.11.2009
  • End Date:29.11.2011

Sarıyer - Çayırbaşı Motorway Tunnel

Construction of 2x2100 m motorway tunnel (NATM) with two lanes between Sarıyer and Çayırbaşı.

  • Employer:İstanbul Metropolitian Municipality
  • Location:İstanbul
  • Start Date:03.12.2007
  • End Date:03.09.2011

Eskipazar - Karabük And Zonguldak - Çaycuma - Bartın Natural Gas Pipe Line

Gaz türbini + kompresör paketi olarak 2+1 (2 ünite işletme altında 1 ünite yedek) konfigürasyonda, kurulu gücü toplam 45,9 MW olan üç adet kompresör ünitesi, pig istasyonu, çapı 48’’ olan istasyon ana giriş-çıkış hatları, çapı 24’’ olan istasyon recycle hattı, unite giriş-çıkış hatları, separator filtrelerin giriş çıkış ünite anti surge hatları, çapı 16’’ olan gaz soğutucu giriş-çıkış hatları ve scada bağlantısı işlerinin tasarım, malzeme temin, inşaat, montaj, işletmeye alma işlerini kapsamaktadır.

  • Employer:Botas Petroleum Pipeline Corporation
  • Location:Zonguldak
  • Start Date:21.05.2007
  • End Date:26.06.2008

Çorum Natural Gas Compressor Station

Design, material supply,construction, installation and commissioning works of three units of compressors with total 45,9 MW installed power, pig station, station main input-output lines with 48’’ diameter, recycle linewith 24’’ diameter, unit input-output lines, input output anti-surge lines of separator filters, input output lines of gas cooler with 16’’ diameter and Scada connection in the form of 2+1 configuration as gas turbine + compressor package (2 unit in operation, 1 unit backup).

  • Employer:Botas Petroleum Pipeline Corporation
  • Location:Çorum
  • Start Date:21.05.2007
  • End Date:26.06.2008

East Blacksea Natural Gas Pipeline Phase-3

Construction, installation and commissioning of ~115 kms 16” dia. Natural gas intercity distribution pipeline from Bayburt to Rize. Besides the main pipeline, below items are realised: 3 ea 16’’ line valves, 1 ea 16’’ pig receiving station, 1 ea 16’’ take-off valve, 1 ea 8’’ take-off valve, Excavation & backfilling of 115 kms, 16’’ dia., pipeline, Railway, highway and river crossings through the line via micro-tunnelling method, NDT tests, hydraulic pressure tests and cathodic protection

  • Employer:Botas Petroleum Pipeline Corporation
  • Location:Bayburt - Rize
  • Start Date:01.06.2005
  • End Date:01.02.2008

Turkey - Greece Natural Gas Pipeline-Phase 2- Offshore Section

Construction of offshore section (Marmara sea crossing) of Turkey – Greece Natural Gas Pipeline. Total offshore length of the pipeline is 17km and 36” inch in diameter. All the operations carried out by a adjoining derric lay barge. Pipeline was laid at a maximum depth of 68m under sea. Besides, 330 m of pipeline was laid onshore.

  • Employer:Botas Petroleum Pipeline Corporation
  • Location:Çanakkale
  • Start Date:01.11.2005
  • End Date:15.07.2007

Blue Stream Samsun - Ankara Natural Gas Pipeline

Construction, installation and commissioning of 500 kms, 48’’ dia. (API 5L GrX65) natural gas pipeline from Samsun to Ankara, which is known as “BLUE STREAM” pipeline. The project aims transportation of Russian natural gas to Mediterranean sea through Black Sea and Turkish distribution lines. Besides the main pipeline below items are realised: 7 ea 16’’ branch valves and 1500 class 16 billion m3/year capacity “pressure reducing and measurement” station, 4 ea 48’’ pigging stations., 17 ea 48’’ line valves, Excavation & backfilling of 500 kms, 48’’ dia., pipeline, Railway, highway and river crossings through the line via micro-tunnelling method, NDT tests, hydraulic pressure tests and cathodic protection.

  • Employer:Botas Petroleum Pipeline Corporation
  • Location:Samsun-Ankara
  • Start Date:30.07.1999
  • End Date:15.10.2002