Şehit Esma Çevik Pumping and Tanker Filling Station

Within the scope of the project, a pumping station with a capacity of 25,000 barrels per day (2 sets), a pumping station with a capacity of 50,000 barrels per day (3 sets), a crude oil tank with a capacity of 25,000 barrels (2 sets) and a tanker filling station will be built.

  • Employer:Turkish Petroleum Corporation
  • Location:Şırnak
  • Start Date:07.12.2023

BiGADİÇ 2-4 mm Granular Fertilizer Production Plant

In the project scope ABCOL with a capacity of -12,500 tons/year -Crushing-Screening Plant with a capacity of 12,500 tons/year, -20,000 tons/year capacity 2-4 mm Granulated Fertilizer Production is being done.

  • Employer:General Directorate of ETİ Mine Works
  • Location:Balıkesir // Bigadiç
  • Start Date:30.09.2022