Completed Projects
Kırka Solid Waste Transmission System
Within the scope of the project, turnkey construction, mechanical and electrical manufacturing of the 2.5 km long conveyor belt, which transfers the clay wastes from the boron production facilities of ETİ Kırka Boron Operations Directorate to the waste pond, was carried out.
- Employer:General Directorate of ETİ Mine Works
- Location:Eskişehir // Seyitgazi // Kırka
- Start Date:21.09.2017
- End Date:08.01.2019
Dervent Strait Stream Remediation
2 kilometers of open/closed tunnel construction for stream remediation of Dervent Strait.
- Employer:General Directorate of ETİ Mine Works
- Location:Eskişehir // Seyitgazi // Kırka
- Start Date:21.09.2017
- End Date:08.01.2019
Kırka Boron Cleaning Product Production Facility
Construction work of the cleaning product production facility with a capacity of 5 ton/h for ETİ Mine Kırka Boron Works.
- Employer:General Directorate of ETİ Mine Works
- Location:Eskişehir // Seyitgazi // Kırka
- Start Date:19.06.2017
- End Date:01.10.2018
Kırka Open Management Workshop and General Workshop Construction Work
2.000 m2 Open Management Workshop and 3.000 m² General Workshop Turn-Key Construction Work.
- Employer:General Directorate of ETİ Mine Works
- Location:Eskişehir // Seyitgazi // Kırka
- Start Date:11.11.2016
- End Date:02.07.2018
Waste Condensed Water Control System
Waste Condensed Water Control System for monitoring Condensed Water quality and preventing the interference of waste water with clean water at Dissolution Chutes, Penta II, Penta III, Penta IV Facilities.
- Employer:General Directorate of ETİ Mine Works
- Location:Eskişehir // Seyitgazi // Kırka
- Start Date:05.06.2017
- End Date:01.12.2017
Kırka Boron Works Field of Operation Various Site Grading Construction Work
General Directorate of ETİ Boron Works Field of Operation, Ground Improvement, Sustaining Wall, Field Concrete Unit Priced Construction Work
- Employer:General Directorate of ETİ Mine Works
- Location:Eskişehir // Seyitgazi // Kırka
- Start Date:02.09.2016
- End Date:01.06.2017
Bigadiç Concentrator Facility-Çamköy Wash Water Line Construction Work
Turn-Key Construction Work of the 3.400 Metres Long Pipeline between ETİ Bigadiç General Directorate of Boron Works Concentrator Facility and Çamköy Dam.
- Employer:General Directorate of ETİ Mine Works
- Location:Balıkesir // Bigadiç
- Start Date:22.08.2016
- End Date:01.11.2016